Double Storey house comprising of 4 bedrooms made out of Steel frames, Steel trusses and Steel floor joists with joists spanning 6.8mt clear span and steel trusses spanning 15mt clear span. Usage of light gauge steel on this project helped in eliminating most of the structural steel on-site, thus making it easier for the builder on-site and reducing the timeframe to erect it.